Thursday, August 30, 2012

Small changes


Things at the house either seem to be slowing down or there's just more to be done than I thought. They are taking care of some of the less "glamorous" stuff like moving heat ducts, patching drywall, sealing tile.  But everything is important. Fortunately, we do have this bit of eye candy above - limestone tile floor being installed! Here's hoping there's enough tile because I've not been able to get the 360flooring.com website to load for weeks and suspect maybe they've gone out of business. Yikes.
Of course, what's also visible here is the microwave trim, apron front sink, and crown moulding.
Other updates to report: tiling in the bathrooms is done. I've put a first coat of paint on the walls, so they should be installing the fixtures shortly.
The ceiling in the big family room is in progress.
And the counter top is now scheduled to be installed next Wednesday (after some annoying delays by the manufacturer, which resulted in my choosing a slightly different color material.)
We move in next month!